Mon. Dec 23rd, 2024
  • Case name: 70MW SZS gas-fired hot water boiler project for heating industry
  • Project company profile: The main business scope is centralized heating
  • Project type: Complete project (providing equipment and supporting equipment, installation and commissioning)
  • Project supporting boiler: SZS70-1.6/130/70-Q
  • Project boiler medium: hot water
  • Project quota output: 70MW

 

70MW hot water boiler
70MW hot water boiler

 

Case Introduction

The heating limited liability company is an enterprise specializing in urban heating. The heating service targets involve institutions and universities, office buildings, residential communities, etc. The boiler is an essential equipment in the heating process. Previously, most of the boilers used by heating companies were coal-fired boilers. However, with the country’s strict environmental improvement, some environmental protection policies have been introduced one after another, and there have been many restrictions on the use of coal-fired boilers. In order to ensure stable central heating for the city, the heating company decided to purchase a gas-fired hot water boiler. After a period of investigation and screening, the heating company chose a 70MW SZS series condensing gas hot water boiler from Zozen Boilers.

The 70MW hot water boiler is a typical energy-saving and environmentally-friendly boiler. The membrane water wall structure is adopted around the furnace and the front and rear walls. The comb-shaped plate is used for welding and sealing between the membrane wall and the drum, and the sealing performance is good. This boiler products thermal efficiency can be as high as 98% or more. And choose the most advanced ultra-low nitrogen burner at home and abroad. With a large diameter furnace, it can achieve ultra-low NOx emission requirements.

Costomer Feedback

The 70MW hot water boiler provided this time has sufficient output, sufficient fuel combustion and high efficiency. The which has saved us a lot of fuel costs. Moreover, the exhaust gas discharged from the SZS series hot water boiler is tested and fully meets the national environmental protection emission regulations. We are deeply impressed by the responsible attitude of ZOZEN’S. We have also specially sent a professional technical team to install, debug and train us to ensure the normal and stable heating during the operation period.
 

Send Message

Leave a Reply

Your email address will not be published. Required fields are marked *